A Technique to capture the MBSE Capability and MBSE Maturity
In the previous two sections, we discussed how to capture both the MBSE Capability and the MBSE Maturity for the organization based on the rationale itself. When we discussed defining the rationale for the MBSE deployment, we introduced two specific techniques (Context Modeling and TeamStorming) that could be used to affect the capture of the rationale. In this section, we shall introduce a technique that can be used to capture both the MBSE Capability and the MBSE Maturity of an organization, known as RAVEnS.
The term RAVEnS is a backronym for Review and Assessment for the Visualization of Enabling Strategies, which is a bit of a mouthful and, therefore, shall simply be referred to as RAVEnS from this point forward.
When we initially discussed MBSE implementation way back in Chapter 2, Model-Based Systems Engineering, we introduced the MBSE Mantra, which stated that to implement MBSE we needed to consider three...