Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
Extreme DAX

You're reading from   Extreme DAX Take your Power BI and Microsoft data analytics skills to the next level

Arrow left icon
Product type Paperback
Published in Jan 2022
Publisher Packt
ISBN-13 9781801078511
Length 470 pages
Edition 1st Edition
Languages
Arrow right icon
Authors (2):
Arrow left icon
Henk Vlootman Henk Vlootman
Author Profile Icon Henk Vlootman
Henk Vlootman
Michiel Rozema Michiel Rozema
Author Profile Icon Michiel Rozema
Michiel Rozema
Arrow right icon
View More author details
Toc

Table of Contents (17) Chapters Close

Preface Part I: Introduction FREE CHAPTER
1.1 DAX in Business Intelligence 1.2 Model Design 1.3 Using DAX 1.4 Context and Filtering Part II: Business cases
2.1 Security with DAX 2.2 Dynamically Changing Visualizations 2.3 Alternative Calendars 2.4 Working with AutoExist 2.5 Intercompany Business 2.6 Exploring the Future: Forecasting and Future Values 2.7 Inventory Analysis 2.8 Personnel Planning Other Books You May Enjoy
Index

The Power BI model

The analysis in this chapter is based on the model below.

You can download the Power BI model for this chapter, 2.8 Personnel Planning.pbix, from this link: https://github.com/PacktPublishing/Extreme-DAX/tree/main/Chapter2.8.

Figure 2.8.1: Power BI model diagram for personnel planning

The model contains two main fact tables:

  • fProjectSales contains projects sold. The primary information in the table is the project type, which is the main characteristic of a project. The table also contains a Number column, which denotes the size of the project in terms of the project type. For example, a project can have type A and number 3, meaning that the project is comparable to three typical type A projects. The table contains the project budget as well.
  • fFTE is a fact table with information about project types. It is an atypical fact table, as it does not contain any data that is strictly time-related. Instead, for each project...
lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $19.99/month. Cancel anytime
Banner background image