It was a long night at the Baysoft Training Inc. corporate office. How did this happen? Could this have been avoided? Why were the application and system not able to handle the load? Why weren't adequate performance and stress tests conducted on the system and application? Was it an application problem, a system resource issue, or a combination of both? All these were questions that the management demanded answers to from the group of engineers, which comprised software developers, network and system engineers, Quality Assurance (QA) testers, and database administrators gathered in the meeting room. There sure was a lot of finger-pointing and blame going around the room. After a little brainstorming, it wasn't long before the group had to decide what needed to be done. The application and its system resources needed to undergo extensive and rigorous testing. This included all facets of the application and all supporting system resources, including, but not limited to, infrastructure, network, database, servers, and load balancers. Such a test would help all involved parties to discover exactly where the bottlenecks were and address them accordingly.
United States
United Kingdom
India
Germany
France
Canada
Russia
Spain
Brazil
Australia
Argentina
Austria
Belgium
Bulgaria
Chile
Colombia
Cyprus
Czechia
Denmark
Ecuador
Egypt
Estonia
Finland
Greece
Hungary
Indonesia
Ireland
Italy
Japan
Latvia
Lithuania
Luxembourg
Malaysia
Malta
Mexico
Netherlands
New Zealand
Norway
Philippines
Poland
Portugal
Romania
Singapore
Slovakia
Slovenia
South Africa
South Korea
Sweden
Switzerland
Taiwan
Thailand
Turkey
Ukraine