Search icon CANCEL
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Conferences
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
Implementing Cisco UCS Solutions

You're reading from   Implementing Cisco UCS Solutions Cisco Unified Computer System is a powerful solution for data centers that can raise efficiency and lower costs. This tutorial helps professionals realize its full potential through a practical, hands-on approach written by two Cisco experts.

Arrow left icon
Product type Paperback
Published in Dec 2013
Publisher Packt
ISBN-13 9781782170662
Length 370 pages
Edition 1st Edition
Concepts
Arrow right icon
Toc

Table of Contents (14) Chapters Close

Preface 1. Cisco UCS Physical Architecture and Installing UCS Hardware FREE CHAPTER 2. Setting Up Lab Using Cisco UCS Emulator 3. Configuring Cisco UCS Using UCS Manager 4. Configuring LAN Connectivity 5. Configuring SAN Connectivity 6. Creating Identity and Resource Pools 7. Creating and Managing Service Profiles 8. Managing UCS through Routine and Advanced Management 9. Virtual Networking in Cisco UCS 10. Configuring Backup, Restore, and High Availability 11. Cisco UCS Failure Scenarios Testing 12. Third-party Application Integration Index

Controlling blade server power


UCS blade server chassis has a maximum of four power supplies. Each power supply is 2500 watts. Under normal conditions, UCS always has enough power to run all blade servers in the chassis. If required, power to each blade server can be capped. This may be required in a disaster situation where a limited amount of power is available.

When manual blade-level power capping is configured in the Global Cap policy, you can set a power cap for each blade server in a Cisco UCS domain.

Use the following procedure to enable the Global Manual Power policy:

  1. Log in to UCS Manager.

  2. Click to expand the Equipment tab in the Navigation pane.

  3. In the main Equipment tab, click to expand Equipment.

  4. Select Global Policies from the Policies tab in the Work pane.

  5. In the Global Power Allocating Policy area, select Manual Blade Level Cap for the Allocation Method:

Once the global power policy is enabled for Manual Blade Level Cap, use the following procedure to allocate power to each blade...

lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at €18.99/month. Cancel anytime