Procurement management is a big topic, and for many of you working with procurement, this may be a very surface-level thing. Perhaps you have contractors that work on your team, or you have reviewed some procurement documentation to make sure the equipment you need is correct. There is a variety of levels possible for a project manager to be involved with in procurement for the project. As we move forward through this section, there are several assumptions that are made in exam questions. Mostly, this is to keep things out of the gray areas and to focus on concepts. These concepts or assumptions may not align at all with that you do now, but may later in your project or careers. Procurement is also represented in a very surface level way without getting too deep into terms and conditions and legalese. The very first assumption on the exam is that you have...
Germany
Slovakia
Canada
Brazil
Singapore
Hungary
Philippines
Mexico
Thailand
Ukraine
Luxembourg
Estonia
Lithuania
Norway
Chile
United States
Great Britain
India
Spain
South Korea
Ecuador
Colombia
Taiwan
Switzerland
Indonesia
Cyprus
Denmark
Finland
Poland
Malta
Czechia
New Zealand
Austria
Turkey
France
Sweden
Italy
Egypt
Belgium
Portugal
Slovenia
Ireland
Romania
Greece
Argentina
Malaysia
South Africa
Netherlands
Bulgaria
Latvia
Australia
Japan
Russia