Getting started
Let's walk through two scripts to generate a new item with a bill of materials: one for an assembling process and the other for manufacturing.
We will set up both, item costing and item tracking for these products.
The examples are created using a CRONUS W1 Microsoft Dynamics NAV 2013 Release 2 database without changes. |
Assembling
In our company, we want to start producing office chairs. These chairs consist of five wheels, a pedestal, a seat, and two arm rests. We will create these four components as a new item and one new item for the end product.
All the items will have a different costing method to demonstrate the effect of cost changes. The end product will support serial number item tracking with a one year warranty period.
Design patterns
Before going into the application, we will have a...