Chapter 5. Executive Decisions: Preparing for your Sametime 8.5.2 Installation
In this chapter, those decisions that need to be made prior to a Sametime installation will be reviewed and discussed. As with any complex project requiring not only software installation but also planning for additional hardware, operating system, network, authentication, and database infrastructure, Sametime requires careful and deliberate planning. Regardless of whether you are implementing a clustered, multi-location, full-service deployment, or a basic Classic Meeting Server upgrade, taking the time to develop a project plan for your environment will save you effort and steps by the end of the project.
In this chapter you will learn:
What decisions are required for your Sametime 8.5.2 installation
What is needed for the growth and stability of a Sametime 8.5.2 environment
How the Sametime software is obtained
What are the software prerequisites
What are the hardware requirements
How to plan for the WAS environment...