Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Save more on your purchases now! discount-offer-chevron-icon
Savings automatically calculated. No voucher code required.
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Conferences
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
Oracle Primavera P6 Version 8: Project and Portfolio Management

You're reading from   Oracle Primavera P6 Version 8: Project and Portfolio Management For project managers and consultants, this book will help you master the main elements of Primavera P6, together with the new features in Version 8. Lots of screenshots and clear explanations make for an easy ride.

Arrow left icon
Product type Paperback
Published in Aug 2012
Publisher Packt
ISBN-13 9781849684682
Length 348 pages
Edition 1st Edition
Arrow right icon
Toc

Table of Contents (25) Chapters Close

Oracle Primavera P6 Version 8: Project and Portfolio Management
Credits
About the Authors
About the Reviewers
www.PacktPub.com
Preface
1. Getting Started with Oracle Primavera P6 FREE CHAPTER 2. Getting Around: Understanding and Customizing the P6 Interface 3. Organizing your Projects with EPS, OBS, and WBS 4. Creating a New Project and Work Breakdown Structure 5. Adding Activities and Relationships 6. Resources 7. Scheduling and Constraints 8. Issues and Risks 9. Baselines and Statusing 10. Project Templates 11. Portfolios 12. Portfolio Analysis 13. Measuring and Scoring Projects 14. Capacity Planning and ROI 15. Dashboards 16. Resource Management Integrations Reporting Index

PeopleSoft


PeopleSoft is widely used in local government, healthcare, and education. As the name implies, PeopleSoft's origins rise from managing groups of people.

Unlike the JDE and EBS integrations, the PeopleSoft integration with P6 comes out of the box at no additional cost, and with very little configuration required. The integration technology used is not FMW and AIA, but is instead based on PeopleSoft's Integration Broker technology.

The P6 integration first appeared in PeopleSoft version 9.0 in 2011 and has been improved and expanded for PeopleSoft 9.1 in 2012. Both the PeopleSoft Program Management and Project Costing modules are required for the integration.

As with JDE and EBS, the global data exchanged between P6 and PeopleSoft center around the three kinds of P6 resources: people, materials, and equipment (labor, materials, and nonlabor).

You can only have materials in PeopleSoft if you have installed the Order Management and Purchasing modules.

Similarly, you must have Asset Management installed in order to set up Equipment.

Note

The global integrations will not send over calendars, roles, or rates. These items must be entered manually in each system.

In PeopleSoft, there is no distinction between activities and WBS elements. Activities are simply WBS elements that do not have any other elements beneath them. These two entities are very distinct in P6, and so when sending data such as resource assignments back to PeopleSoft, you must be careful that the activities and WBS elements map properly between the two systems. The installation guide from Oracle covers how to manage these properly and avoid common pitfalls.

Actual Costs, Hours, and Commitments are sent from PeopleSoft into user-defined fields at the WBS or activity level, depending on how the data is rolled up.

Note

PeopleSoft 9.1 also allows integration between its own internal timesheets application and P6's timesheet application, Progress Reporter.

lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $19.99/month. Cancel anytime