Way back, before Programmable Logic Controllers (PLCs) became the norm, plant floor automation was performed with racks and racks of industrial relays, pneumatic plunger timers, and electromagnetically counters to control the starting and stopping of motors, opening of valves, and other control-related process interactions. The program that ran the control for such a setup was not a program at all but a combination of interconnected circuits, timers, and relays. By forming the electrical paths, physical actions such as opening valves, running motors, and turning on lights were accomplished. The programmer of a relay system like this was the plant floor electrical engineer and program changes involved physically changing the electrical circuits. There was no programmer's Terminal or interface to connect to and there weren&apos...
United States
United Kingdom
India
Germany
France
Canada
Russia
Spain
Brazil
Australia
Argentina
Austria
Belgium
Bulgaria
Chile
Colombia
Cyprus
Czechia
Denmark
Ecuador
Egypt
Estonia
Finland
Greece
Hungary
Indonesia
Ireland
Italy
Japan
Latvia
Lithuania
Luxembourg
Malaysia
Malta
Mexico
Netherlands
New Zealand
Norway
Philippines
Poland
Portugal
Romania
Singapore
Slovakia
Slovenia
South Africa
South Korea
Sweden
Switzerland
Taiwan
Thailand
Turkey
Ukraine