Cloning domains from test to production
Oracle SOA Suite 11g enables administrators to further minimize manual steps involved when moving the domain infrastructure across physical machines. It allows what is referred to as green field movement, which entails leveraging existing out-of-the-box tools and capabilities to perform this activity without the reliance on external or third-party tools.
The following diagram depicts, at a high level, the process involved when moving Oracle Fusion Middleware components. This minimizes the amount of work that would otherwise be required to reapply all the customization and configuration changes made in one environment to another. You can install, configure, customize, and validate Oracle Fusion Middleware in a test environment. Once the system is stable and performs as desired, you can create the production environment by moving a copy of the components and their configurations from the test environment, instead of reimplementing all the changes that were incorporated into the test environment.
What is moved exactly?
Installed binaries and patches
Configuration and metadata
Security configuration (for example, OPSS policies)
Supports MDS metadata and JCA connection factories
MovePlan—rewiring external references to match target
Data sources and endpoint addresses