SASE Design
Engineering success requires successfully executing a strategy through knowledgeable technical resources that are empowered and enabled to perform. Often, the organization relies on previously successful efforts to define the criteria for current or future success. The results of tactical execution that leverages past success creates variable results. Failure rates can average more than 50% of projects, even those that leverage professionally qualified teams.
Often, organizations launch a project due to pressure for success without a design that guarantees success. The project should be held in the planning stage until the design provides a 99.999% probability of success. The organization’s financial well-being is at risk from poorly designed projects.
At the peak of Enterprise Resource Planning (ERP) software implementation, over 80% of ERP projects that invested over $ 500,000 USD into the project caused the catastrophic financial failure of the organization...