Procurement management is a big topic, and for many of you working with procurement, this may be a very surface-level thing. Perhaps you have contractors that work on your team, or you have reviewed some procurement documentation to make sure the equipment you need is correct. There is a variety of levels possible for a project manager to be involved with in procurement for the project. As we move forward through this section, there are several assumptions that are made in exam questions. Mostly, this is to keep things out of the gray areas and to focus on concepts. These concepts or assumptions may not align at all with that you do now, but may later in your project or careers. Procurement is also represented in a very surface level way without getting too deep into terms and conditions and legalese. The very first assumption on the exam is that you have...
United States
United Kingdom
India
Germany
France
Canada
Russia
Spain
Brazil
Australia
Argentina
Austria
Belgium
Bulgaria
Chile
Colombia
Cyprus
Czechia
Denmark
Ecuador
Egypt
Estonia
Finland
Greece
Hungary
Indonesia
Ireland
Italy
Japan
Latvia
Lithuania
Luxembourg
Malaysia
Malta
Mexico
Netherlands
New Zealand
Norway
Philippines
Poland
Portugal
Romania
Singapore
Slovakia
Slovenia
South Africa
South Korea
Sweden
Switzerland
Taiwan
Thailand
Turkey
Ukraine