Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
Systems Engineering Demystified

You're reading from   Systems Engineering Demystified A practitioner's handbook for developing complex systems using a model-based approach

Arrow left icon
Product type Paperback
Published in Jan 2021
Publisher Packt
ISBN-13 9781838985806
Length 468 pages
Edition 1st Edition
Arrow right icon
Author (1):
Arrow left icon
Jon Holt Jon Holt
Author Profile Icon Jon Holt
Jon Holt
Arrow right icon
View More author details
Toc

Table of Contents (17) Chapters Close

Preface 1. Section 1: Introduction to Systems Engineering
2. Chapter 1: Introduction to Systems Engineering FREE CHAPTER 3. Chapter 2: Model-Based Systems Engineering 4. Section 2: Systems Engineering Concepts
5. Chapter 3: Systems and Interfaces 6. Chapter 4: Life Cycles 7. Chapter 5: Systems Engineering Processes 8. Section 3: Systems Engineering Techniques
9. Chapter 6: Needs and Requirements 10. Chapter 7: Modeling the Design 11. Chapter 8: Verification and Validation 12. Chapter 9: Methodologies 13. Chapter 10: Systems Engineering Management 14. Section 4: Next steps
15. Chapter 11: Best Practices 16. Other Books You May Enjoy

The project assessment and control process

The main aim of the project assessment and control process is to assess the management plans that have been put in place and to monitor the progress of the project against these plans. This process is very closely related to the project planning process as it is concerned with ensuring that all the outcomes of that process are fit for purpose and are executed appropriately. The project assessment and control process is shown in the following diagram:

Figure 10.6 – Process content view for the project assessment and control process

The outcomes, represented by SysML properties, that are identified for this process are described as follows:

  • Corrective action ensures that the decision management process is applied effectively.
  • Deviation also ensures that the decision management process is applied effectively.
  • Performance measure ensures that the measurement process is applied effectively.
  • Project...
lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $19.99/month. Cancel anytime
Banner background image