Time for action – configuring our first Subreport
The steps for configuring our first Subreport are as follows:
We will configure the size of the Sub-report in our report. Then we will open the Subreport and add and configure a bar chart. We go to the main Report and enlarge the area covered by the Sub-report object so that it fills the empty space as shown in the following screenshot:
The size of the Sub-report in the main Report will be the available size that we have later in the Subreport.
We go the Subreport SubReportBarChart and begin to design it. We can double-click on the Sub-report object we placed in the report or click on the tab that refers to this object.
We add a chart object to the Report Header section and enlarge it so it looks like the following screenshot:
Note
We can see that to the left-hand side there is a kind of gray grid. This grid represents the area that we cannot use in the Subreport. The size of the gray grid depends on the size we have given the Sub-report object...