Transportation and scheduling with GATP
Transportation and scheduling with SAP GATP provides the consistent and automatic scheduling of the sales order, based on the delivery date requested by the customer. Transportation and scheduling in GATP calculates the following dates when the sales order line item runs the ATP check:
- Unloading date
- Delivery date
- Goods issue date
- Loading date
- Transportation planning
- Material availability date
SAP APO has provided the following options to determine these dates, which are mentioned next:
- Scheduling using the condition technique
- Scheduling using SNP master data (transportation lane)
- Configurable process scheduling
- Scheduling with dynamic route determination
The system uses the transportation and scheduling functionality to provide scheduling dates based on configuration done for the different options mentioned previously. If you configure and the prerequisite for configurable process...