Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Save more on your purchases now! discount-offer-chevron-icon
Savings automatically calculated. No voucher code required.
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Conferences
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
​Application Lifecycle Management on Microsoft Power Platform

You're reading from   ​Application Lifecycle Management on Microsoft Power Platform A comprehensive guide to managing the deployment of your solutions

Arrow left icon
Product type Paperback
Published in Oct 2024
Publisher Packt
ISBN-13 9781835462324
Length 222 pages
Edition 1st Edition
Concepts
Arrow right icon
Author (1):
Arrow left icon
Benedikt Bergmann Benedikt Bergmann
Author Profile Icon Benedikt Bergmann
Benedikt Bergmann
Arrow right icon
View More author details
Toc

Table of Contents (17) Chapters Close

Preface 1. Chapter 1: An Intro to ALM 2. Chapter 2: ALM in Power Platform FREE CHAPTER 3. Chapter 3: Power Platform Environments 4. Chapter 4: Dataverse Solutions 5. Chapter 5: Power Platform CLI 6. Chapter 6: Environment Variables, Connection References, and Data 7. Chapter 7: Approaches to Managing Changes in Power Platform ALM 8. Chapter 8: Essential ALM Tooling for Power Platform 9. Chapter 9: Project Setup 10. Chapter 10: Pipelines 11. Chapter 11: Advanced Techniques 12. Chapter 12: Continuous Integration/Continuous Delivery 13. Chapter 13: Deepening ALM Knowledge 14. Assessments 15. Index 16. Other Books You May Enjoy

Configuring PPP

Before we can start with PPP or pipelines in Power Platform, there are a few things (for example, installing solutions and connecting environments) to set up.

Microsoft recommends having a host environment whose only purpose is to configure all pipelines in Power Platform. This is because to use PPP, a solution needs to be installed. This solution will add dependencies on several OOB Tables. To not disrupt your implementation, the host environment should be, as mentioned, a separate environment.

To install the mentioned solutions go to PPAC, select the environment, and open Dynamics 365 apps under Resources.

Figure 9.20 – Navigating to Dynamics 365 apps

Figure 9.20 – Navigating to Dynamics 365 apps

Under Dynamics 365 apps, select Install app. A new side pane appears on the right-hand side of the page. Here, search for Power Platform Pipelines, select Next, agree to the terms, and press Install.

Figure 9.21 – Installing PPP

Figure 9.21 – Installing PPP

Note

PPP...

lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $19.99/month. Cancel anytime