Answers
- Option B.
Priority is controlled by the work templates, sending the lower numbered priority first. This will allow the workers to receive first the urgent orders.
- Option C.
All the other options are required to perform replenishment.
- Option C.
The most common error is incorrectly assigning the location at the location directives. In this case, moving items to the bay door indicates that we need to review the put-away work, which is controlled by the sales order put location directive.